Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

BUSKİ Çan Drinking Water Treatment Plant

  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  BUSKİ Çan Drinking Water Treatment Plant

BUSKİ Mustafa Kemal Paşa Çan Drinking Water Treatment Plant

A slow sand filter-type drinking water treatment plant located in Bursa’s Mustafa Kemal Paşa district with a total capacity of 18,144 m3/day.

Operation Start Date: May 2017

Operation Ending Date: September 2019

Total Capacity: 18,144 m³/day

Project Description

A slow sand filter-type drinking water treatment plant located in Bursa’s Mustafa Kemal Paşa district with a total capacity of 18,144 m3/day. The plant incorporates an entry pre-chlorination structure, simple settling lagoons, slow sand filters, filtration, and chlorine contact tank treatment units.

Sorularınızı Bize İletin

Her konuda bize yazabilirsiniz, müşteri temsilcilerimiz en kısa zamanda size geri dönüş sağlayacaktır.

(Tüm alanların doldurulması zorunludur)


600