Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

BUSKI West Wastewater Treatment Plant

  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  BUSKI West Wastewater Treatment Plant

BUSKI West Wastewater Treatment Plant

Bursa West Wastewater Treatment Plant is built in accordance with the five-stage Bardenpho process (Phoredox) to serve a population equivalent of 650,000 residents.

Operation Start Date: May 2012
Operation Ending Date: September 2019
Population Equivalent: 650.000
Total Capacity: 87.500 m³/day

Project Description

Bursa West Wastewater Treatment Plant is built in accordance with the five-stage Bardenpho process (Phoredox) to serve a population equivalent of 650,000 residents. Average daily volume of 87,500 m³/day of wastewater is treated.

The plant consists of the following units:

  • Coarse Grid,
  • First-Stage Pumping Station, Fine Grids, Sand-Holding Tanks,
  • Pretreatment Unit consisting of Second-Stage Pumping Station,
  • Flow Measuring Channels,
  • Selector and Anaerobic Tanks Aerated Lagoons,
  • Distribution and Collection Systems,
  • Final Settling Tanks,
  • Purified Water System,
  • Service and Fire Hydrant Tank and Pumping Station,
  • Return Activated Sludge Pumping Stations,
  • High Return Activated Sludge Pumping Station,
  • Sludge Grid System and Buffer Tanks,
  • Sludge Dewatering and Lime Stabilization System,
  • Ammonia Removal Unit,
  • Generator Buildings,
  • Substation and Power Distribution Buildings,
  • Operations Buildings and Ateliers,
  • Auxiliary Buildings and Structures.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]