Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

ISKI Büyükçekmece Advanced Biological Wastewater Treatment Plant

  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Büyükçekmece Advanced Biological Wastewater Treatment Plant

ISKI Büyükçekmece Advanced Biological Wastewater Treatment Plant

Büyükçekmece Advanced Biological Wastewater Treatment Plant will completely eliminate the risk of pollution threatening Büyükçekmece Lake, a major source of potable water for İSKİ.

Operation Start Date: July 2017
Operation Ending Date: October 2019

Capacity: 132.000 m³ / day

Population Equivalent: 500.000

Project Description

With the 132,000 m3/day-capacity Büyükçekmece Advanced Biological Wastewater Treatment Plant, the pollution risk of Lake Büyükçekmece, one of İSKİ’s most important drinking water sources, has been completely eliminated. The water treated at Büyükçekmece Advanced Biological Wastewater Treatment and pretreatment plants is transferred to the new treatment plant through tunnels and is subjected to biological treatment. The plant that services a total population of 500,000, will treat wastewater including their phosphor and nitrogen particles, and turn it into clean water that is not harmful for the nature. Once the plant begins operating, the pollution risk of Lake Büyükçekmece, one of İSKİ’s most important drinking water sources, will be fully eliminated and no more wastewater will be discharged from this region into the Marmara Sea.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]