Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

ISKI Büyükçekmece Wastewater Pretreatment Plant

  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Büyükçekmece Wastewater Pretreatment Plant

ISKI Büyükçekmece Wastewater Pretreatment Plant

Treated wastewater is discharged through a deep-sea outfall, with 4,847 meters under the ground and 1,897 meters under the sea, into the Marmara Sea at a depth of 40 meters.

Operational Dates: 2003 – 2013

Capacity: 155.120 m³ / day

Project Description

Büyükçekmece Wastewater Pretreatment Plant serves Büyükçekmece, Mimarsinan, Çatalca, Tepecik and Ahmediye Village districts. The plant was built as part of an environmental protection project to conserve Büyükçekmece Lake, a major water source for Istanbul, and Büyükçekmece
Bay, which plays a crucial role in preserving the city’s natural balance. Collected wastewater is transferred into the facility with an average flow rate of 155,000 m3/day. Treated wastewater is then discharged through a deep-sea outfall, with 4,847 meters under the ground and 1,897 meters under the sea, into the Marmara Sea at a depth of 40 meters with 6,744 meters long deep-sea discharge line in total.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]