Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

ISKI Paşabahçe Wastewater Pretreatment Plant

  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Paşabahçe Wastewater Pretreatment Plant

ISKI Paşabahçe Wastewater Pretreatment Plant

Built on a 33,000 square meter tract, the Paşabahçe Wastewater Pretreatment Plant has a wastewater treatment capacity of 575,000 m³ /day. Wastewater flows into the facility through three main channels.

Operational Dates: 2008 – 2013

Capacity: 575.000 m³ / day

Project Description

Built on a 33,000 square meter tract, the Paşabahçe Wastewater Pretreatment Plant has a wastewater treatment capacity of 575,000 m³ /day. Wastewater flows into the facility through three main channels. The first collection main delivers wastewater from the southern parts of the plant; the second main delivers wastewater collected in the Beykoz basin in the North; and the third main delivers wastewater generated in Çavuşbaşı and Paşabahçe.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]