Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

ISKI Selimpaşa Advanced Biological Wastewater Treatment Plant

  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Selimpaşa Advanced Biological Wastewater Treatment Plant

ISKI Selimpaşa Advanced Biological Wastewater Treatment Plant

With a treatment capacity of 70.000 m³/ day, Selimpaşa Advanced Biological WWTP provides a service to a population equivalent of 300.000.

Operation Start Date: January 2017
Operation Ending Date: October 2019

Total Capacity: 70.000 m³/day

Population Equivalent: 300.000

Project Description

The project transfers wastewater to the Selimpaşa Advanced Biological Wastewater Treatment Plant through four main collection tunnels. Wastewater collected here is then treated in the plant by applying biological methods, and discharged at a 35 meters-deep point, 1,690 meters off the coast into the sea. With a daily capacity of 70,000 m3 and servicing a total population of 300,000, the plant treats the wastewater of Selimpaşa, Celaliye, Kumburgaz, Kavaklı and Ortaköy districts that previously used to directly flow into the Marmara Sea.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]