Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]

ISKI Tuzla Advanced Biological Wastewater Treatment Plant

  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Tuzla Advanced Biological Wastewater Treatment Plant

ISKI Tuzla Advanced Biological Wastewater Treatment Plant

Tuzla Advanced Biological Wastewater Treatment Plant which is Turkey’s First and Largest Thermal Sludge Drying Plant using cogeneration, serves a population of 500.000 residents and prevents the discharge of 150 tons of untreated solid waste into the sea. Kuzu Group operated Tuzla Advanced Biological WWTP between 2003-2013. In 2009, Group accomplished the second stage of the WWTP construction.

Turkey’s First and Largest Wastewater Reuse Project Using Sand Filtration and UV Disinfection

Turkey’s Largest Odor Removal Plant Using Ozone Scrubbers

Operational Dates: 2003 – 2013

Capacity: 100.000 m³ / day

Population Equivalent: 500.000

Project Description

Commissioned in 1998, Tuzla Biological Wastewater Treatment Plant serves a population of 500,000 residents and prevents the discharge of 150 tons of untreated solid waste into the sea. Wastewater generated along the shoreline between Darıca and Maltepe is delivered to the facility via tunnels measuring 4.5 meters in diameter and a pipeline network. The wastewater is then biologically treated with a flow rate of 100,000 m3/day. Subsequently, treated wastewater is discharged through a 2,200 meter long outfall pipe into the Marmara Sea at a depth of 46 meters.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]