ISKI Yenikapı Wastewater Pretreatment Plant

  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Yenikapı Wastewater Pretreatment Plant

ISKI Yenikapı Wastewater Pretreatment Plant

Yenikapı Wastewater Pretreatment Plant was built as part of the Southern Haliç (Golden Horn) Sewage Project.

Operation Start Date: January 2017
Operation Ending Date: October 2019

Total Capacity: 864.000 m³ / day

Population Equivalent: 4.320.000

Project Description

Southern Haliç (Golden Horn) Sewage Project, which serves a population of 4.320.000 residents on the southern and western banks of the Haliç, including Bakırköy, Güngören, Esenler, Bayrampaşa, Gaziosmanpaşa, Eyüp, Zeytinburnu, Fatih, and Eminönü, and covers some 100 million square meters of land area. An average daily volume of 864,000 m³ of wastewater is treated at the Yenikapı wastewater pretreatment plant and then discharged into the Bosphorus at a depth of 60 meters.