BUSKİ City Solid Waste Storage Area Leachate Treatment Plant and Outfall Pipes

  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  BUSKİ City Solid Waste Storage Area Leachate Treatment Plant and Outfall Pipes

BUSKİ City Solid Waste Storage Area Leachate Treatment Plant and Outfall Pipes

Operation Project Start Date:May 2012

Operation End Date: September 2019

Proje Description

The treatment plant was designed in two stages to provide treatment of 500 m3/day of liquid leachate in 2020, and rising to 1,000 m3/day by 2030 Hamitler Solid Waste Leachate Treatment Plant consists of a three-stage biological treatment and sludge dewatering system.

• Acid Cleaning and Neutralization Unit (Sewer Line)
• Sewer Pumping Station
• Aerated (Aerobic) Lagoons
• Facultative Lagoons
• Sequencing Batch Reactors
• Sludge Dewatering Units

The plant has been constructed on the Mudanya Road in the Hamitler region next to the Kent Solid Waste Regular Storage Field and treats filtrate solid wastewaters that have high pollution load. The filtrate water that comes from the Kent Solid Waste Regular Storage Field is being transferred to the treatment plant through two transmission lines, one of them serving as back-up. Only one of these transmission lines is operational, the second line is kept as a back-up option in case of blockage/petrification. Kent Solid Waste Storage Field Filtrate Water Treatment Plant has a design capacity of Q=500 m3/day and was designed with an organic weight capacity of KOİ=15000 kg/ day, BOİ=7,500 kg/day. The treatment process is completed in three stages. The units operational in the process chronologically are as follows: aerated lagoons, facultative lagoons and sequencing batch reactors (AKR). The plant was designed in three stages with two lagoons each, and with piping and valves options, and aerated and facultative lagoons which can be operated in parallel or consecutively. Additional sludge is eliminated after being dewatered with the belt press located in the operation building. Treated water is first transferred to the Geçit Pumping Station through the DB 300 discharge line, which is 2,500 meters long, and then to the West Wastewater Treatment Plant. The contract signed into includes the plant as well as operation and maintenance services of the discharge line used to transfer treated water.