Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]


600

ISKI Bahçeşehir Biological Wastewater Treatment Plant

  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Bahçeşehir Biological Wastewater Treatment Plant

ISKI Bahçeşehir Biological Wastewater Treatment Plant

In 2004, İSKİ began to operate the plant. In the same year, the plant underwent an extensive upgrade and all mechanical equipment in the facility was replaced. Currently, the plant has a daily average flow capacity of 7,400 m³.

Operational Dates: 2004 – 2013

Capacity: 7.400 m³ /day

Project Description

Built by Emlak Bank in Bahçeşehir to preserve the Küçükçekmece Lake basin, which provides drinking water to Istanbul, the Bahçeşehir Biological Wastewater Treatment Plant was commissioned in 2000. In 2004, İSKİ began to operate the plant. In the same year, the plant underwent an extensive upgrade and all mechanical equipment in the facility was replaced. Currently, the plant has a daily average flow capacity of 7,400 m³.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]