        ISKI Baltalimanı Wastewater Pretreatment Plant

        Treated wastewater is discharged through outfall pipes measuring 2,200 mm in diameter into the Bosphorus at a depth of 70 meters, 350 meters from the shoreline.

        Operational Dates: 2003 – 2022
        Capacity: 625.000 m³/day

        Population Equivalent 3.000.000

        Project Description

        Baltalimanı Wastewater Pretreatment Plant was constructed and put into service in 1997. Wastewater generated in the districts of Kâğıthane, Beyoğlu, Şişli, Beşiktaş and Sarıyer is collected with an average flow rate of 625,000 m³ /day and transferred into the Baltalimanı Pretreatment Plant. Treated wastewater is then discharged through outfall pipes measuring 2,200 mm in diameter into the Bosphorus at a depth of 70 meters, 350 meters from the shoreline.