Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

(fields required)


600

[recaptcha]


600

ISKI Baltalimanı Wastewater Pretreatment Plant

  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Baltalimanı Wastewater Pretreatment Plant

ISKI Baltalimanı Wastewater Pretreatment Plant

Treated wastewater is discharged through outfall pipes measuring 2,200 mm in diameter into the Bosphorus at a depth of 70 meters, 350 meters from the shoreline.

Operational Dates: 2003 – 2013
Capacity: 625.000 m³/day

Population Equivalent 3.000.000

Project Description

Baltalimanı Wastewater Pretreatment Plant was constructed and put into service in 1997. Wastewater generated in the districts of Kâğıthane, Beyoğlu, Şişli, Beşiktaş and Sarıyer is collected with an average flow rate of 625,000 m³ /day and transferred into the Baltalimanı Pretreatment Plant. Treated wastewater is then discharged through outfall pipes measuring 2,200 mm in diameter into the Bosphorus at a depth of 70 meters, 350 meters from the shoreline.

Send us your questions

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

(fields required)


600

[recaptcha]