        ISKI Büyükçekmece Wastewater Pretreatment Plant

        Home  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Büyükçekmece Wastewater Pretreatment Plant

        ISKI Büyükçekmece Wastewater Pretreatment Plant

        Treated wastewater is discharged through a deep-sea outfall, with 4,847 meters under the ground and 1,897 meters under the sea, into the Marmara Sea at a depth of 40 meters.

        Operational Dates: 2003 – 2013

        Capacity: 155.120 m³ / day

        Project Description

        Büyükçekmece Wastewater Pretreatment Plant serves Büyükçekmece, Mimarsinan, Çatalca, Tepecik and Ahmediye Village districts. The plant was built as part of an environmental protection project to conserve Büyükçekmece Lake, a major water source for Istanbul, and Büyükçekmece
        Bay, which plays a crucial role in preserving the city’s natural balance. Collected wastewater is transferred into the facility with an average flow rate of 155,000 m3/day. Treated wastewater is then discharged through a deep-sea outfall, with 4,847 meters under the ground and 1,897 meters under the sea, into the Marmara Sea at a depth of 40 meters with 6,744 meters long deep-sea discharge line in total.