Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

    (fields required)


    600

    [recaptcha]


      600


        600

        Search

        ISKI Kadıköy Wastewater Pretreatment Plant

        Home  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Kadıköy Wastewater Pretreatment Plant

        ISKI Kadıköy Wastewater Pretreatment Plant

        Thanks to this plant and the completed collector investments, it has finally become possible to swim in Caddebostan for the first time in many years.

        Operational Dates: 2003 – 2013

        Capacity: 833.000 m³ / day

        Project Description

        The Kadıköy Wastewater Pretreatment Plant has made it possible for Istanbulites to once again swim along the Caddebostan coast. Wastewater collected through the collectors located along the shoreline between Kartal Orhantepe and Üsküdar Salacak is treated with a flow rate of
        833,000 m3/day. It is then discharged through a 2,308-meter long outfall pipe into the Bosphorus at a depth of 51.5 meters, into the undercurrent of the Black Sea. An advanced ozonation unit at the facility addresses the odor issue. Kadıköy Wastewater Pretreatment Plant also makes a positive  contribution to the environment with its unique landscape design and architectural style.

        Send us your questions

        You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

          (fields required)


          600

          [recaptcha]