You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.
Tuzla Advanced Biological Wastewater Treatment Plant which is Turkey’s First and Largest Thermal Sludge Drying Plant using cogeneration, serves a population of 500.000 residents and prevents the discharge of 150 tons of untreated solid waste into the sea. In 2010, Group accomplished the second stage of the WWTP construction.
Process
The system consists of pretreatment, biological phosphorus removal, denitrification and nitrification through extended aeration, and final clarifiers, thus ensuring complete removal of carbon, nitrogen and phosphorus. Other facilities include sludge drying with CHP, anaerobic sludge digestion, odor removal with ozone, sludge decaying, sludge drying, UV disinfection, biofilters, biological phosphorus removal, pretreatment, preclarification, aeration, blower building, final clarifiers, and a cogeneration unit.
Goals
Service Area
Treatment of wastewater generated in Gebze, Darıca, Çayırova, Pendik, Maltepe, Kartal and Tuzla, and flowing into the Marmara Sea.
You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible