Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

    (fields required)


    600

    [recaptcha]


      600


        600

        Search

        ISKI Üsküdar Wastewater Pretreatment Plant

        Home  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Üsküdar Wastewater Pretreatment Plant

        ISKI Üsküdar Wastewater Pretreatment Plant

        Pretreated wastewater is discharged through a deep-sea outfall at a depth of 47 meters into the undercurrent of the Bosphorus, which flows toward the Black Sea.

        Operational Dates: 2003 – 2013

        Capacity: 77.760 m³/ day

        Project Description

        Wastewater collected in the Üsküdar district, located on the southwest bank of the Bosphorus, between Beylerbeyi, Haydarpaşa and the E5 motorway, is treated at the Üsküdar Wastewater Pretreatment Plant with a flow rate of 77.760 m³ /day. The pretreatment process includes the separation of solid waste, sand and foam found in wastewater. Pretreated wastewater is then discharged through a deep-sea outfall at a depth of 47 meters into the undercurrent of the Bosphorus, which flows toward the Black Sea.

        Send us your questions

        You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

          (fields required)


          600

          [recaptcha]