        ISKI Yenikapı Wastewater Pretreatment Plant

        Home  /  Ongoing Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  ISKI Yenikapı Wastewater Pretreatment Plant

        ISKI Yenikapı Wastewater Pretreatment Plant

        Yenikapı Wastewater Pretreatment Plant was built as part of the Southern Haliç (Golden Horn) Sewage Project.

        Operation Start Date: January 2017
        Operation Ending Date: October 2019

        Total Capacity: 864.000 m³ / day

        Population Equivalent: 4.320.000

        Project Description

        Southern Haliç (Golden Horn) Sewage Project, which serves a population of 4.320.000 residents on the southern and western banks of the Haliç, including Bakırköy, Güngören, Esenler, Bayrampaşa, Gaziosmanpaşa, Eyüp, Zeytinburnu, Fatih, and Eminönü, and covers some 100 million square meters of land area. An average daily volume of 864,000 m³ of wastewater is treated at the Yenikapı wastewater pretreatment plant and then discharged into the Bosphorus at a depth of 60 meters.