Dil

Contact Us

You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible.

    (fields required)


    600

    [recaptcha]


      600


        600

        Search

        İSU Gebze Wastewater Treatment Plant

        Home  /  Completed Plant Operations Projects  /  Plant Operations  /  WTP & Infrastructure  /  İSU Gebze Wastewater Treatment Plant

        İSU Gebze Wastewater Treatment Plant

        The plant protects the İzmit Bay from pollution by collecting and treating domestic wastewater generated by Gebze’s 670,000 inhabitants.

        Operational Dates: 2012 – 2014

        Capacity: 144.000 m³ / day

        Population Equivalent: 670.000

        Project Description

        Gebze Wastewater Treatment Plant is the biggest environmental project of the Kocaeli Metropolitan Municipality. Built on a 107-acre tract on the coast of Çayırova, between the Şişecam Factory and TSE, the project has a total cost of TL 62.5 million. The plant protects the İzmit Bay from pollution by collecting and treating domestic wastewater generated by Gebze’s 670,000 inhabitants. Having a wastewater treatment capacity of 144,000 m³/ day, the Gebze Wastewater Treatment Plant is the first facility in Turkey to be operated by a private company immediately after it was commissioned. Unlike the arrangements in other operation projects, Kuzu Group has also paid for electricity while operating this plant.

        Process
        The system consists of pretreatment, biological phosphorus removal, denitrification and nitrification via extended aeration, and final clarifiers, thus ensuring complete removal of carbon, nitrogen and phosphorus.

        Send us your questions

        You can write to us in every respect, that provide for our customer service representatives are returned to you as soon as possible

          (fields required)


          600

          [recaptcha]