ISKI Baltalimanı Wastewater Pretreatment Plant

İSKİ Baltalimanı Wastewater Pretreatment Plant services 3,000,000 people.

Operation Start Date: January 2003

 

Operation Ending Date: January 2022

 

Population Equivalent: 3.000.000

Project Description

 

The wastewater of Kağıthane, Beyoğlu, Şişli, Beşiktaş and Sarıyer districts is transferred to the Baltalimanı pretreatment facility with an average flowrate of 625,000 m3 per day. Here the wastewater is treated and then transferred with 2,200 mm-thick discharge lines to a 350 meter-far point and discharged into the 70m-deep undercurrents of the Bosphorus. The plant services a total of 3,000,000 people.